My colleagues and I are currently working on parceling subdivisions for LS-MFEZ. Since the land use plan as well as the layout plan for the phase 1 development were done by a consulting company, our department are expected to design the subdivisions only for the phase 2 - 4.
I am enjoying the project fully because the subdivisions that we are recently designing would be built in the real world. So far, we are somewhat done with parceling for the phase 2. We should be able to be done with it soon though (hopefully!).
It, however, requires a lot of patience as we have to keep adjusting the parcels little by little. For instance, it took us about 3 working days to finish parceling for the industrial area just in the phase 3. Because of the task, I am more interested in physical planning per se.
The project is supposed to be done sometime after 2030. I hope to see the economic zone in the real world as soon as possible :)
I am enjoying the project fully because the subdivisions that we are recently designing would be built in the real world. So far, we are somewhat done with parceling for the phase 2. We should be able to be done with it soon though (hopefully!).
It, however, requires a lot of patience as we have to keep adjusting the parcels little by little. For instance, it took us about 3 working days to finish parceling for the industrial area just in the phase 3. Because of the task, I am more interested in physical planning per se.
The project is supposed to be done sometime after 2030. I hope to see the economic zone in the real world as soon as possible :)